24 Apr 2024 Contract awarded for upgrading the italian railway line Orte-Falconara
The Eteria Consortium, of which Itinera is a member, will carry out track-doubling works on the PM228 – Albacina railway section, an integral part of the Orte-Falconara line.
The project, worth more than 95 million euros also financed with Pnrr funds, consists of the creation of a new track parallel to the existing one, which will extend for about 4 km between the Movement Post at km 228 and the Albacina station. This initiative, in addition to doubling between Fabriano and Albacina, includes the removal of a level crossing, replaced by a modern underpass, and improves the accessibility and safety of Albacina station.
When completed, the work will allow for a reduction in travel time between Rome and Ancona, an increase in the number of trains that can run on the route, and greater accessibility to rail service.
Don’t miss our news